ZAC LE MENIE ET EN RIGNION

CHATEAU-GAILLARD

Programme

Assisting a developer with the implementation of a ZAC project comprising 390 housing units, a network of public spaces, and a new village square

Client

NOVADE (SEM Aménageur)

Area

16 ha

Cost

129,830 €

Scope

Chief Architect and Urban Planner since 2020

Schedule

Studies 2014-2019

Environment

Controlled urban expansion between two hamlets, maximizing pedestrian traffic and public spaces

Team

Architect and urban planner : SUD architectes Landscape architect : Axe Saône Sustainable development project management assistance : EODD Civil engineering (roads & utilities) : Infratech

The project is designed in a phased approach, over five stages, to support the site’s transformation over time and ensure seamless integration into the existing fabric.

The urban layout features a gradual increase in density, moving from the existing suburban fabric toward a more compact project core, connected to the town center and sports facilities. This transition maintains a balance between landscape continuity and urban intensification.

Particular attention is paid to enhancing the banks of the Seymard stream, integrated into a structuring green network that reinforces the site’s environmental quality.

The project as a whole emphasizes a landscape-oriented and residential approach, prioritizing shared spaces, sustainable transportation, and a variety of housing types suited to new ways of living in suburban areas.

LYCÉE TECHNIQUE LA MACHE

LYON

2023