HALL IN ONE
SAINT-CHAMOND - FRANCE
Programme
Renovation of Novaciéries Hall 01: creation of an economic activity hub at the entrance to the site, a center for shopping and leisure, restaurants, a movie theater, creation of an indoor street, and expansion through a new building housing services and offices
Client
CAP METROPOLE, SAINT-ETIENNE METROPOLE, CFA RHONE-ALPES AUVERGNE
Area
9,600 m²
Cost
28,5 M€
Scope
Full Service
Schedule
Competition winner 2013 Completed in 2019
Environment
Roof with living space, preservation of the
historic structure (double cast-iron columns from 1898) and the
three central naves
Team
Project management assistance : Alamo
Lead architect : Atelier Rivat
Associate architect : SUD architectes
Quantity surveyor : Evalue
Concrete structural engineer : IC Béton
Steel structural engineer : ICC
Building services (MEP) engineer : ALTERGIS
Civil engineering (roads & utilities) : B Ingénierie
Technical inspection body : Alpes Contrôles
Health & safety coordinator : Apave
Construction scheduling & coordination : Planitec BTP
Photographer : Erick Saillet
In Saint-Chamond, the Hall in One project is part of the revitalization of a former industrial site in direct contact with the city center, with the goal of reestablishing urban connections between the industrial heart of the city and the contemporary urban fabric. The project restores a sense of cohesion to a fragmented complex by reintegrating the site into daily routes and the urban fabric.
At the heart of the project, the existing large hall, a legacy of the 19th century, is preserved and repurposed to become a powerful symbol of the local industrial heritage. Its structure and roof are preserved, transforming the building into a vast inhabited shelter capable of accommodating a variety of programs.
This hall becomes a unifying space where different functions coexist, organized into autonomous volumes inserted into the existing nave. This layering of uses allows the original architecture to remain legible while infusing it with new contemporary content.
The project develops an architectural language based on metal mesh and weaving, which engages in a dialogue with the historic structural framework. This interplay of superimpositions reinforces the site’s identity while ensuring its transformation.
Public space now traverses the site in multiple directions, creating north-south and east-west openings that reconnect the hall to the city. The landscape is thus reconfigured as a continuous fabric, where heritage and contemporary uses intertwine.
Hall in One offers a thoughtful reinterpretation of industrial heritage, transforming it into an open, hybrid space deeply rooted in urban life.