1,500 m², of which 550 m² of indoor area
and 950 m² of covered outdoor area
Cost
7,4 M€
Scope
Full Service
Schedule
Competition 2025
Environment
Rainwater Harvesting
Recovery of Heat from Leakage Flow
Perlite Filtration
Solar Thermal Energy Generation
Team
Client : Commune de Six-Fours-les-Plages
Architect : SUD architectes
Structural engineer, Building services (MEP) engineer, Thermal engineering, Civil engineering (roads & utilities), Acoustics consultant, Cost consultancy, Design synthesis coordination, Construction scheduling & coordination, Fire safety systems coordination : TPFI
Landscape architect : Sarah Ten Dam
Furniture, Signage : Partie Commune
Geotechnical engineer : Géoterria
3D visualization : Vincent Atelier
The project is also designed as a scalable facility, capable of eventually accommodating new uses such as an outdoor water play area or a wellness space. This flexibility ensures the complex’s long-term viability and its ability to adapt to the future needs of the community and its users.